First picture show the issue in the main line. The length of the main sewer line was 140 ft, much to long for a properly cleaning. In time the roots went through the hub sealing and clogged the line. At 45 ft has been installed the clean out for future maintenance. The depth of the trench was 3 ft. The last picture show us the site after all the work has been finished.
No comments:
Post a Comment