Saturday, September 18, 2021

Some time happens

 We recently had to repair a sewer line for a residential in the right of way after the ComEd installed a post above the sewer line and they injected foam into the ground to stabilize the post. Unfortunately the foam went into the sewer line and completely stopped the flow into the sewer line. Some time happens. 

 






BBP Plumbing Inc

No comments:

Post a Comment